Johnson Excavating - Foley, Minnesota businessman has Jacobs 31-21 installed.

School of Environmental Studies Ground breaking to commissioning of SES renewable energy project.

Kennedy Community School - The new school will be the first one in the nation to meet the LEED silver certification rating for green schools.

Jacobsen Tortoise Farm LLC - WERC installs a Jacobs 31-20 to offset high energy costs at a unique farm near Bird Island, MN.

Melody Lane Farms - WERC provided design, site planning services, permitting assistance and installed the farm-sized Jacobs 31-20 wind turbine.

Prairie Woods Learning Center WERC installs a Jacobs wind turbine which brings the Center closer to being 100% renewable energy.

Sherburne County Pubic Works Facility This facility will incorporate sustainable building guidelines/ passive solar lighting, thermal mass-based HVAC / renewable energy systems / sustainable landscaping techniques and more.

Hunt Utilities Group, LLC (HUG) Wind Turbine Installation WERC helped HUG acquire a $20,000 grant and built the largest of the wind turbines to be installed at their research campus located at Pine River, Minnesota.

Persell Wind Turbine Installation John and Patty Persell are the proud owners of a new Jacobs wind turbine on a 120' tower that helps reduce mercury in water and fish.


Boy's and Berry's Farm Wind Turbine Bob and Carol Nibbe use electricity from a small wind turbine to power their sustainable farming-oriented irrigation system.


Diamond Wind Energy, LLC Bob Meyerson owner of Diamond Wind Energy, LLC, made a co-generation agreement with Kandiyohi Power Company to sell power generated from the new wind turbine planned, installed and serviced by WERC.

"Windy River Fair" Wind Turbine Installation The first permanent wind turbine system installed and monitored online at a county fairgrounds in Minnesota.


Winkelman Building Corporation This was the first installation of a triple junction amorphous solar electric system on the rooftop of new office building.

The Eco-Domes Center Constructed using sustainable living techniques and technologies to conserve energy.

White Bear Lake Racquet & Swim Club Energy efficiency is not a great feature of tennis court bubbles, so Paul Steinhauser, began to look for options.

Walker Animal Hospital Steve and Jane Eckholm own the Walker Animal Hospital in Walker, MN uses geothermal and solar conservation technologies.

Hybrid Hydronics Combining geothermal with an outdoor wood boiler furnace allows a steady source of heat via the heat pump with a batch heating boost from the wood boiler.

Hydronic Snow & Ice Melt By placing Uponor in-floor heating under Eco-Stone Paving the beautiful sidewalks and patio are free of snow and ice during the winter months.

 

Other WERC Building Projects-

  • Bay Point on Pelican Lake, MN
  • Brainerd Public Utilities
  • Dodge Nature Center
  • Jackson Meadow